D
DougF
Guest
Guest
Offline
I have a gram scale and a beam from which to freely suspend the rods. What I am trying to figure out is a good system for hanging the rods from from consistant fulcrum points to get accurate weighing.
I have tried tying string around it, but not a good method, too inaccurate. I have considering drilling two 3/32" holes and running safety wire through, but am not excited about boring holes in the rods.
Any ideas?
I have tried tying string around it, but not a good method, too inaccurate. I have considering drilling two 3/32" holes and running safety wire through, but am not excited about boring holes in the rods.
Any ideas?