Jim_Gruber
Yoda
Offline
Time for cleanup and paint. Floorpan arrives early next week I am told.
Hi Guest!
smilie in place of the real @
Pretty Please - add it to our Events forum(s) and add to the calendar! >> Here's How << 

Finally Some Progress on Springs today. All Clamps bent up and fitted. Drilled on top for rivet, need to wait for final assembly to drill for bottom Spacer Bolt. Didn't have any issues drilling hole for the 4th from bottom leaf for Rivet. Springs are Hardened Steel but I found the right type of bit. All leaves on one side are now wire brushed and painted. Will flip over in the AM paint the other side. Will flip over again and coat with graphite paint similar to Slip Plate on both sides and then on Wednesday assemble the stack. Next week I'll do it all over again with the other spring but in that case Spring Clamps are already bent ip and drilled and painted. Other than drilling one Spring Leaf for a rivet, that side will go much faster to get done.