Geo Hahn
Yoda
Offline
The chips were spread while the 'paint' was still thick and wet. With the method used he had to walk about on the wet floor.
Doing all the chips at once (rather than in sections as you paint) got a very uniform look.
The pros work really fast but still it takes 4 visits over 4 days to finish the job and then wait a few days before you can walk on it and more days before you can drive.
Doing all the chips at once (rather than in sections as you paint) got a very uniform look.
The pros work really fast but still it takes 4 visits over 4 days to finish the job and then wait a few days before you can walk on it and more days before you can drive.
Hey Guest!
smilie in place of the real @
Pretty Please - add it to our Events forum(s) and add to the calendar! >> 