jlaird
Great Pumpkin
Offline
Shows this weeks progress. See the last photo.
Today was oil pan, gesh, took two hours. Was red on top, then black, then LBC green.
Next week is the drive shaft and differential, that's a nasty job. The end is in sight. Hope to have all cleaned up and ready to go by April 11 when we leave for Holland and such for a few weeks.
Might even have motor back by then.
Afterwards will be body work, etc.
Today was oil pan, gesh, took two hours. Was red on top, then black, then LBC green.
Next week is the drive shaft and differential, that's a nasty job. The end is in sight. Hope to have all cleaned up and ready to go by April 11 when we leave for Holland and such for a few weeks.
Might even have motor back by then.
Afterwards will be body work, etc.