jlaird
Great Pumpkin

Offline
https://groups.msn.com/TheAustinHealeySpriteProject/shoebox.msnw?action=ShowPhoto&PhotoID=84
When I arrived Tony the Godfather was already there. Above pics is what we saw.
Removing all remaining undercoating, resandblast some areas. Two part primer, repair the bit of rust, replace A posts skins. remove dents, maybe five small ones the size of eggs and the rear area, a ripple or so. Prime sand, prime skim as required, block sand prime. Seam sealer in all. Two coats at least of Old English White, four coats at least of clear coat. Sand between the second and third coats, buff after the last coat. Total cost 3K, time, first of Sept. We will see but I expect it should be true as he said 3 to 5 weeks. However Tony needs to get the A post pannels.
The other work in his shop was outstanding.
Rebuilt Master Cylinder arrived while I was gone, one item less.
And today the Air Filters arrived, as good looking in real life as the pic.
When I arrived Tony the Godfather was already there. Above pics is what we saw.
Removing all remaining undercoating, resandblast some areas. Two part primer, repair the bit of rust, replace A posts skins. remove dents, maybe five small ones the size of eggs and the rear area, a ripple or so. Prime sand, prime skim as required, block sand prime. Seam sealer in all. Two coats at least of Old English White, four coats at least of clear coat. Sand between the second and third coats, buff after the last coat. Total cost 3K, time, first of Sept. We will see but I expect it should be true as he said 3 to 5 weeks. However Tony needs to get the A post pannels.
The other work in his shop was outstanding.
Rebuilt Master Cylinder arrived while I was gone, one item less.
And today the Air Filters arrived, as good looking in real life as the pic.