• Hi Guest!
    You can help ensure that British Car Forum (BCF) continues to provide a great place to engage in the British car hobby! If you find BCF a beneficial community, please consider supporting our efforts with a subscription.

    There are some perks with a member upgrade!
    **Upgrade Now**
    (PS: Subscribers don't see this gawd-aweful banner
Tips
Tips

Pakistani Pile Driver

  • Thread starter Deleted member 8987
  • Start date
D

Deleted member 8987

Guest
Guest
Offline
https://www.youtube-nocookie.com/embed/cFb0nLCKypg?rel=0



Pakistani Pile Driver . . . .

Here's a construction technique that would be handy to know. Read the calculations below then click on the link at the bottom of the article to see this technique in action.
It’s something to cheer up any engineer. It will put you in the picture and keep you up-to-date with the latest construction developments.


Below is a link to a short video of a Pakistani pile driving construction technique. Notice that the pile driving becomes effective when the extra man jumps on.
Very finely tuned! The chant is also catchy.
Now, let's analyze the Engineering here:
6 men x 180 lbs. = 1080 lbs. static force Jumping up and down will create a 3 times dynamic effect = 3240 lbs./jump = 1.6-ton thumps if the pile is tapered
to 2 in. x 2 in., cross section at the tip = sq. in. So, dynamic press "Add a man" feature
will increase to 950 psi, so buy the option!

Increase the chant and dynamic force goes up to 5 times to bring maximum pressure/thump to 1600 psi for a 7-man team.


Quite good, and it will penetrate hard clay and sandy soil but not hard rock!

We figure the foreman is the guy on the tambourine...you'll probably watch this twice because you won't want to believe
your eyes the first time...











































 
I think the tambourine was critical! :excitement:
 
Then they have trouble when an earthquake comes.
 
Back
Top