healeyboz
Jedi Knight
Offline
So, it has been about 2 1/2 years since I started this deal and the end is certainly in sight. I took the car out a few times last summer, around the block, to work out a few bugs. My goal is to have her finished by spring break. (The end of March.) I would like to get a few short runs out of her to work out the kinks and be ready for the first real warm morning drive.
THings to finish:
1. Master Cylinder back from Apple Hydraulics
2. Bleed system and finish emergency brakes
3. Tenax studs for the tonneau
4. Grill
5. Get sending unit back from Kim and< hopefully, finally solve the fuel gauge issue.
6. License and drive her!!
Because she has not been registered in over 35 years, I wonder if there will be any penalties to pay?
THings to finish:
1. Master Cylinder back from Apple Hydraulics
2. Bleed system and finish emergency brakes
3. Tenax studs for the tonneau
4. Grill
5. Get sending unit back from Kim and< hopefully, finally solve the fuel gauge issue.
6. License and drive her!!
Because she has not been registered in over 35 years, I wonder if there will be any penalties to pay?