D
Deleted member 8987
Guest
Guest
Offline
Been working up for at least a year to this big convention.
Part of the convention is tours of surrounding participant's yards.
So, we spent a year getting all these walls in, dirt shovelled, equipment down, all sorts of stuff w
that required lots of help as I sure can't do it anymore.
So, at 0800 today, first ones showed up, last left at 1445 or so.
446 folks signed the guestbook, figure 10% don't, that about 500 folks here.
Had about 9 "operators", keeping things moving.
Oh, yes, National Garden Railway Convention tour, I was layout 62......about 1500 feet of track, 80-90 switches......all radio/battery.....
Part of the convention is tours of surrounding participant's yards.
So, we spent a year getting all these walls in, dirt shovelled, equipment down, all sorts of stuff w
that required lots of help as I sure can't do it anymore.
So, at 0800 today, first ones showed up, last left at 1445 or so.
446 folks signed the guestbook, figure 10% don't, that about 500 folks here.
Had about 9 "operators", keeping things moving.
Oh, yes, National Garden Railway Convention tour, I was layout 62......about 1500 feet of track, 80-90 switches......all radio/battery.....
Hey Guest!
smilie in place of the real @
Pretty Please - add it to our Events forum(s) and add to the calendar! >> 

