GarageMahal Construction Project Update
So, y'day the contractor finished hanging sheetrock! Rough electric is complete, rough plumbing is complete...now we wait for the sheetrock finishers to do their thing. Meantime, the shower is set in place & the commode & sink are on site; the appliances are ordered (white 20" wide free standing stove/oven, white 20" microwave, white under counter 2-door refrigerator/freezer & white sink); and the doors are ordered. Plus, the cabinet maker is coming by next week to make his measurements.
Entire project adds almost 1,000 square feet to living space since it's connected to house by 8'x16' covered breezeway & Jerri's outdoor kitchen. And, because it'll be separated from GarageMahal by an insulated metal outside door, it takes that much space away from the GarageMahal....hehehe....another reason to add onto the GarageMahal!
Here's what it looks like today:
1) Looking into pantry area from breezeway entry. Door on angle is entrance to full bath. Entry door to garage is hidden to left behind Jerri's pantry cabinets. We've not enclosed my garage panel box yet; I'm still thinking about how I want to do it while maintaining access for future additions.
2) Looking back at breezeway entry and up stairs to 2nd floor studio apartment.
3) Better view of studio apartment landing and the cathedral ceilings over 1st floor area.
4) From center of studio apartment, looking back at landing and down into pantry/bath area.
5) Kitchenette area of studio apartment. Door to right is to attic part of GarageMahal. AC/heating vents in floor will be built into the cabinet kick boards.
6) Large cathedral ceiling 6'x6' dormer area of studio apartment. Door to left is same door to attic part of GarageMahal as in previous photo. Dormer is on opposite wall to kitchenette. You can also see the other AC/heating vets in either wall on both sides of dormer.
And here's a sketch of the project's layout (not to scale):